Hydropower
Ongoing
Arun Hydro
Project Details
- Location
- Nepal
- Duration
- Ongoing
Project Overview
Civil works for the Arun Hydropower facility, contributing to Nepal's rapidly expanding clean energy infrastructure. The project includes intake structures, water conveyance systems, and powerhouse civil works โ demonstrating Paramax's growing capability in hydropower construction.
โก
Challenges
Remote mountain terrain with challenging access routes. River diversion management during construction. Extreme weather conditions affecting work schedules.
โ
Solutions
Purpose-built access roads and aerial ropeway systems for material transport. Engineered cofferdam and diversion channel system. Weather-resilient construction scheduling with contingency planning.